PART I: SUMMARY INFORMATION AND JUSTIFICATION  
In Part I, complete Sections A, B, C, and D for all capital assets (IT and non-IT). Complete Sections E and F for IT capital assets.
  
 
Section A: Overview (All Capital Assets)  
The following series of questions are to be completed for all investments.
  
 
I. A. 1. Date of Submission:  
2006-06-15 
  
I. A. 2. Agency:  
184 
  
I. A. 3. Bureau:  
15 
  
I. A. 4. Name of this Capital Asset:  
(short text - 250 characters) 
IT Security Line of Business 
  
I. A. 5. Unique ID: (For IT investments only, see section 53. For all other, use agency ID system.)  
184-15-02-01-01-2100-00 
  
I. A. 6. What kind of investment will this be in FY2008?  
(Please NOTE: Investments moving to O&M ONLY in FY2008, with Planning/Acquisition activities prior to FY2008 should not select O&M. These investments should indicate their current status.) 
E-Gov LoB Oversight 
  
I. A. 8. Provide a brief summary and justification for this investment, including a brief description of how this, closes in part or in whole, an identified agency performance gap:  
(long text - 2500 characters) 
The ISS LOB investment was established through the efforts of an OMB sponsored security task force. The objective of the ISS LOB is to leverage best practices throughout the Federal government for implementing the Federal Information Security Act (FISMA) and improving cyber security. The task force identified four specific security areas as candidates for ISS Centers of Excellence (COE), Security Awareness Training, Situational Awareness and Incident Response (SAIR), FISMA Reporting, and Selection, Evaluation and Implementation of Security Solutions (Security Solutions/Lifecycle). The OMB ISS LOB Exhibit 300, dated August 5, 2005, directs each Agency to either propose their intention to become a COE or to submit migration plans to procure security services from a COE. This OMB Exhibit 300 supports USAID's joint proposal (partnering with the Department of State) to become a shared service center for Security Awareness Training. This Exhibit 300 supplements the Statement of Capabilites Proposal submitted to the Department of Homeland Security on September 14, 2006. USAID has proven security practices that meet all the attributes identified by the ISS LOB. In February 2005, USAID was the first Agency to receive an A+ on the Federal Computer Security Report Card by the House Government Reform Committee. USAID was able to repeat this success with another A+ and become the only Federal Agency with a perfect score of 100 . The COE solutions provided in this business case include the promotion and adoption of USAID best practices to improve the effectiveness of information security across the federal government. 
  
I. A. 9. Did the Agency's Executive/Investment Committee approve this request?  
yes 
  
 
I. A. 9. a. If "yes", what was the date of this approval?  
2006-08-03 
  
I. A. 10. Did the Project Manager review this Exhibit?  
yes 
  
I. A. 12. Has the agency developed and/or promoted cost effective, energy-efficient and environmentally sustainable techniques or practices for this project.  
yes 
  
 
I. A. 12. a. Will this investment include electronic assets (including computers)?  
yes 
  
I. A. 12. b. Is this investment for new construction or major retrofit of a Federal building or facility? (answer applicable to non-IT assets only)  
no 
  
 
I. A. 12. b. 1. If "yes", is an ESPC or UESC being used to help fund this investment?  
  
I. A. 12. b. 2. If "yes", will this investment meet sustainable design principles?  
  
I. A. 12. b. 3. If "yes", is it designed to be 30% more energy efficient than relevant code?  
  
I. A. 13. Does this investment support one of the PMA initiatives?  
yes 
  
 
I. A. 13. a. If "yes", check all that apply:  
  
I. A. 13. b. Briefly describe how this asset directly supports the identified initiative(s).  
(medium text - 500 characters) 
Strategic Management of Human Capital This investment will provide direction, support and resources to government professionals with security roles and responsibilities. Use of common solutions will reduce and/or eliminate duplication of effort an 
  
I. A. 14. Does this investment support a program assessed using the Program Assessment Rating Tool (PART)?  
(For more information about the PART, visit www.whitehouse.gov/omb/part.) 
no 
  
 
I. A. 14. a. If "yes", does this investment address a weakness found during the PART review?  
  
I. A. 14. b. If "yes", what is the name of the PARTed Program?  
(short text - 250 characters) 
  
I. A. 14. c. If "yes", what PART rating did it receive?  
  
I. A. 15. Is this investment for information technology? (see section 53 for definition)  
yes 
  
I. A. 16. What is the level of the IT Project (per CIO Council's PM Guidance)?  
Level 1 - Projects with low-to-moderate complexity and risk. Example: Bureau-level project such as a stand-alone information system that has low- to-moderate complexity and risk. Level 2 - Projects with high complexity and/or risk which are critical to the mission of the organization. Examples: Projects that are part of a portfolio of projects/systems that impact each other and/or impact mission activities. Department-wide projects that impact cross-organizational missions, such as an agency-wide system integration that includes large scale Enterprise Resource Planning (e.g., the DoD Business Mgmt Modernization Program). Level 3 - Projects that have high complexity, and/or risk, and have government-wide impact. Examples: Government-wide initiative (E-GOV, President's Management Agenda). High interest projects with Congress, GAO, OMB, or the general public. Cross-cutting initiative (Homeland Security). 
Level 3 
  
I. A. 17. What project management qualifications does the Project Manager have? (per OMB's PM Guidance):  
(1) - The project manager assigned for this investment has been validated as qualified in accordance with OMB PM Guidance.; (2) - The project manager assigned for this investment is in the process of being validated as qualified in accordance with OMB PM Guidance.; (3) - The project manager assigned for this investment is not validated as qualified in accordance with OMB PM Guidance.; (4) - The qualifications for the project manager named have not been evaluated.; (5) - No project manager is currently assigned for this investment.; (6) - N/A -- This is not an IT investment. 
(1) Project manager has been validated as qualified for this investment 
  
I. A. 18. Is this investment identified as "high risk" on the Q4 - FY 2006 agency high risk report (per OMB's "high risk" memo)?  
no 
  
I. A. 19. Is this a financial management system?  
no 
  
 
I. A. 19. a. If "yes", does this investment address a FFMIA compliance area?  
  
 
I. A. 19. a. 1. If "yes" which compliance area?  
(short text - 250 characters) 
  
I. A. 19. a. 2. If "no", what does it address?  
(medium text - 500 characters) 
  
I. A. 19. b. If "yes", please identify the system name(s) and system acronym(s) as reported in the most recent financial systems inventory update required by Circular A-11 section 52  
(long text - 2500 characters) 
  
I. A. 20. What is the percentage breakout for the total FY2008 funding request for the following? (This should total 100%)  
  
 
I. A. 20. a. Hardware  
25 
  
I. A. 20. b. Software  
25 
  
I. A. 20. c. Services  
50 
  
I. A. 20. d. Other  
0 
  
I. A. 21. If this project produces information dissemination products for the public, are these products published to the Internet in conformance with OMB Memorandum 05-04 and included in your agency inventory, schedules and priorities?  
n/a 
  
Section B: Summary of Funding  
  
 
I. B. 1. Provide the total estimated life-cycle cost for this investment by completing the following table.  
All amounts represent budget authority in millions, and are rounded to three decimal places. Federal personnel costs should be included only in the row designated "Government FTE Cost," and should be excluded from the amounts shown for "Planning," "Full Acquisition," and "Operation/Maintenance." The total estimated annual cost of the investment is the sum of costs for "Planning," "Full Acquisition," and "Operation/Maintenance." For Federal buildings and facilities, life-cycle costs should include long term energy, environmental, decommissioning, and/or restoration costs. The costs associated with the entire life-cycle of the investment should be included in this report.
Note: For the cross-agency investments, this table should include all funding (both managing and partner agencies). Government FTE Costs should not be included as part of the TOTAL represented.
 
PY-1 and Spending Prior to 2006PY 2006CY 2007BY 2008
Planning$0.00$0.00$0.00$0.00
Acquisition$0.00$0.00$0.03$0.03
Subtotal Planning & Acquisition$0.00$0.00$0.03$0.03
Operations & Maintenance$0.00$0.00$0.02$0.02
TOTAL$0.00$0.00$0.05$0.05
Government FTE Costs$0.00$0.00$0.15$0.15
Number of FTE represented by cost$0.00$0.00$1.20$1.20
 
  
I. B. 2. Will this project require the agency to hire additional FTE's?  
yes 
  
 
I. B. 2. a. If "yes", How many and in what year?  
(medium text - 500 characters) 
2 in FY08. It is anticipated that most support can be provided by contractors. 
  
I. B. 3. If the summary of spending has changed from the FY2007 President's budget request, briefly explain those changes.  
(long text - 2500 characters) 
  
Section D: Performance Information  
In order to successfully address this area of the exhibit 300, performance goals must be provided for the agency and be linked to the annual performance plan. The investment must discuss the agency's mission and strategic goals, and performance measures must be provided. These goals need to map to the gap in the agency's strategic goals and objectives this investment is designed to fill. They are the internal and external performance benefits this investment is expected to deliver to the agency (e.g., improve efficiency by 60 percent, increase citizen participation by 300 percent a year to achieve an overall citizen participation rate of 75 percent by FY 2xxx, etc.). The goals must be clearly measurable investment outcomes, and if applicable, investment outputs. They do not include the completion date of the module, milestones, or investment, or general goals, such as, significant, better, improved that do not have a quantitative or qualitative measure.
Agencies must use Table 1 below for reporting performance goals and measures for all non-IT investments and for existing IT investments that were initiated prior to FY 2005. The table can be extended to include measures for years beyond FY 2006.
  
 
I. D. 1. Table 1  
(Character Limitations: Strategic Goal(s) Supported - 250 Characters; Performance Measure - 250 Characters; Actual/baseline (from Previous Year) - 250 Characters; Planned Performance Metric (Target) - 250 Characters; Performance Metric Results (Actual) - 250 Characters; Measurement Indicator - 250 Characters; Baseline - 250 Characters; Planned Improvement to the Baseline - 250 Characters; Actual Results - 250 Characters) 
  
I. D. 2. Table 2  
Fiscal YearMeasurement AreaMeasurement GroupingMeasurement IndicatorBaselinePlanned Improvement to the BaselineActual Results
2007Mission and Business ResultsSecurityKey Asset & Critical Infrastructure Protection: Standardization baseline lowers overall risk to Federal Government# of weaknesses reported in POA&MReduce # of weaknesses reported in POA&M by 10%TBD
2007Mission and Business ResultsSecurityKey Asset & Critical Infrastructure protection: Increased situational awareness and incident response# of agencies using situational awareness and response solutionsIncrease # of agencies using situational awareness and incident response solutions by 10%TBD
2007Mission and Business ResultsWorkplace Policy Development And ManagementResource Training & Development: Establishing baseline of security trainingCurrent cost of ISS trainingReduce cost per seat by 10% for user trainingTBD
2007Mission and Business ResultsWorkplace Policy Development And ManagementResource Training and Development for Baseline training# of relevant course offeringsIncrease in # of course offerings by 10%TBD
2007Processes and ActivitiesFinancial ManagementCost Savings/avoidance due to elimination of redundancies$ per seat spent on info securityDecrease in $ spent per seat on info security by 10%TBD
2007Processes and ActivitiesEfficiencyImproved quantity of C&A performed% systems have completed C&AIncrease in % of systems with a completed C&A by 10%TBD
2007Processes and ActivitiesEfficiencyDecrease in cost of C&A performed$ spent performing C&ADecrease in $ spent performing C&A by 10%TBD
2007Customer ResultsCustomer SatisfactionService or Product Delivery meets government standards# of ISS solutions meeting baseline configuration standardsIncrease in # of solutions meeting baseline configuration standards by 10%TBD
2007Customer ResultsCustomer Satisfaction# of security professionals in Federal Government satisfied with adequacy and applicability of security training and tools availableX% of customer help/requested inquiries/calls/emails resolved within Y timeframeImprovement in X% of customer help/requested inquiries/calls/emails resolved and/or in Y timeframeTBD
2008Customer ResultsInformation Management# of agencies migrated to ISS LBO COE'sX Agencies migrating to ISS LOB COE10% agencies migrating to ISS LOB COEsTBD
 
  
Section F: Enterprise Architecture (EA)  
In order to successfully address this area of the business case and capital asset plan you must ensure the investment is included in the agency's EA and Capital Planning and Invesment Control (CPIC) process, and is mapped to and supports the FEA. You must also ensure the business case demonstrates the relationship between the investment and the business, performance, data, services, application, and technology layers of the agency's EA.
  
 
I. F. 1. Is this investment included in your agency's target enterprise architecture?  
yes 
  
 
I. F. 1. a. If "no", please explain why?  
(long text - 2500 characters) 
  
I. F. 2. Is this investment included in the agency's EA Transition Strategy?  
no 
  
 
I. F. 2. a. If "yes", provide the investment name as identified in the Transition Strategy provided in the agency's most recent annual EA Assessment.  
(medium text - 500 characters) 
  
I. F. 2. b. If "no" please explain why?  
(long text - 2500 characters) 
This investment is designed to support a line of business not initiate a new system. USAID has not identified any new procedures or standards that would impact or change existing EA. 
  
I. F. 3. Identify the service components funded by this major IT investment (e.g., knowledge management, content management, customer relationship management, etc.). Provide this information in the format of the following table. For detailed guidance regarding components, please refer to http://www.whitehouse.gov/omb/egov/.  
FEA SRM Component - Use existing SRM Components or identify as "NEW". A "NEW" component is one not already identified as a service component in the FEA SRM. FEA Service Component Reused - A reused component is one being funded by another investment, but being used by this investment. Rather than answer yes or no, identify the reused service component funded by the other investment and identify the other investment using the Unique Porject Identifier (UPI) code from the OMB Ex 300 or Ex 53 submission. Internal or External Reuse? - 'Internal' reuse is within an agency. For example, one agency within a department is reusing a service component provided by another agency within the same department. 'External' reuse is one agency within a department reusing a service comonent provided by another agency in another department. A good example of this is an E-Gov initiative service being reused by multiple organizations across the federal government. Funding Percentage - Please provide the percentage of the BY requested funding amount used for each service component listed in the table. If external, provide the funding level transferred to another agency to pay for the service. (Character Limitations: Agency Component Name - 250 Characters; Agency Component Description - 500 Characters) 
Agency Component NameAgency Component DescriptionFEA SRM Service TypeFEA SRM ComponentFEA Service Component Reused - Component NameFEA Service Component Reused - UPIInternal or External Reuse?BY Funding Percentage
Security Awareness TrainingSkills ManagementHuman Capital / Workforce ManagementEducation / TrainingData Warehouse184-15-02-01-02-2020-04Internal4
Security Awareness TrainingProject ManagementCustomer Relationship ManagementProgram / Project ManagementBusiness Rule Management No Reuse4
Security Awareness TrainingInformation SharingKnowledge ManagementKnowledge Distribution and DeliveryDigital Signature Management No Reuse15
Security Awareness TrainingProject ManagementManagement of ProcessesConfiguration ManagementBusiness Rule Management No Reuse4
Security Awareness TrainingProject ManagementManagement of ProcessesChange ManagementBusiness Rule Management No Reuse4
SAIRProject ManagementManagement of ProcessesProgram / Project ManagementBusiness Rule Management No Reuse4
SAIRInformation SharingKnowledge ManagementKnowledge Distribution and DeliveryDigital Signature Management No Reuse7
SAIRIntrusion Detection and Incident ResponseSecurity ManagementIntrusion DetectionMulti-Lingual Support184-15-02-01-02-2020-04Internal10
SAIRIntrusion Detection and Incident ResponseSecurity ManagementIntrusion PreventionMulti-Lingual Support184-15-02-01-02-2020-04Internal12
SAIRIntrusion Detection and Incident ResponseSecurity ManagementIncident ResponseMulti-Lingual Support184-15-02-01-02-2020-04Internal11
SAIRCertification & AccreditationSecurity ManagementCertification and AccreditationMulti-Lingual Support184-15-02-01-02-2020-04Internal13
SAIRIntrusion Detection and Incidence ResponseSecurity ManagementVirus ProtectionMulti-Lingual Support184-15-02-01-02-2020-04Internal8
SAIRProject ManagementManagement of ProcessesConfiguration ManagementBusiness Rule Management184-15-02-01-02-2020-04Internal4
 
  
I. F. 4. To demonstrate how this major IT investment aligns with the FEA Technical Reference Model (TRM), please list the Service Areas, Categories, Standards, and Service Specifications supporting this IT investment.  
FEA SRM Component - Service Components identified in the previous question should be entered in this column. Please enter multiple rows for FEA SRM Components supported by multiple TRM Service Specifications. Service Specification - In the Service Specification field, Agencies should provide information on the specified technical standard or vendor product mapped to the FEA TRM Service Standard, including model or version numbers, as appropriate. (Character Limitations: Service Specification (i.e., vendor and product name) - 250 characters) 
FEA SRM ComponentFEA TRM Service AreaFEA TRM Service CategoryFEA TRM Service StandardService Specification (i.e., vendor and product name)
Intrusion DetectionService Platform and InfrastructureSupport PlatformsPlatform IndependentCOTS: Cisco Secure IDS
Intrusion DetectionService Platform and InfrastructureHardware / InfrastructureServers / ComputersCOTS: Cisco Secure IDS
Intrusion DetectionService Platform and InfrastructureHardware / InfrastructureLocal Area Network (LAN)COTS: Cisco Secure IDS
Intrusion DetectionService Platform and InfrastructureHardware / InfrastructureNetwork Devices / StandardsCOTS: Cisco Secure IDS
Intrusion DetectionService Platform and InfrastructureDatabase / StorageStorageCOTS: Cisco Secure IDS
Intrusion DetectionService Interface and IntegrationInteroperabilityData Format / ClassificationCOTS: Cisco Secure IDS
Intrusion DetectionComponent FrameworkSecuritySupporting Security ServicesCOTS: Cisco Secure IDS
Intrusion DetectionComponent FrameworkData ManagementReporting and AnalysisCOTS: Cisco Secure IDS
Incident ResponseService Access and DeliveryAccess ChannelsOther Electronic ChannelsCOTS: netForensics
Incident ResponseService Access and DeliveryDelivery ChannelsIntranetCOTS: netForensics
Incident ResponseService Access and DeliveryService TransportService TransportCOTS: netForensics
Incident ResponseService Platform and InfrastructureSupport PlatformsPlatform IndependentCOTS: netForensics
Incident ResponseService Platform and InfrastructureDelivery ServersApplication ServersCOTS: netForensics
Incident ResponseService Platform and InfrastructureHardware / InfrastructureServers / ComputersCOTS: netForensics
Incident ResponseService Platform and InfrastructureDatabase / StorageDatabaseCOTS: netForensics
Incident ResponseComponent FrameworkSecuritySupporting Security ServicesCOTS: netForensics
Incident ResponseComponent FrameworkPresentation / InterfaceDynamic Server-Side DisplayCOTS: netForensics
Incident ResponseComponent FrameworkBusiness LogicPlatform DependentCOTS: netForensics
Incident ResponseComponent FrameworkData ManagementDatabase ConnectivityCOTS: netForensics
Incident ResponseService Interface and IntegrationInteroperabilityData Format / ClassificationCOTS: netForensics
Incident ResponseService Interface and IntegrationInteroperabilityData TransformationCOTS: netForensics
Risk ManagementService Platform and InfrastructureAccess ChannelsWeb BrowserCOTS: nCircle
Risk ManagementService Platform and InfrastructureDelivery ChannelsIntranetCOTS: nCircle
Risk ManagementService Platform and InfrastructureDelivery ChannelsInternetCOTS: nCircle
Risk ManagementService Platform and InfrastructureDelivery ChannelsVirtual Private Network (VPN)COTS: nCircle
Risk ManagementService Platform and InfrastructureService RequirementsAuthentication / Single Sign-onCOTS: nCircle
Risk ManagementService Platform and InfrastructureSupport PlatformsPlatform IndependentCOTS: nCircle
Risk ManagementService Platform and InfrastructureDelivery ServersWeb ServersCOTS: nCircle
Risk ManagementService Platform and InfrastructureDelivery ServersPortal ServersCOTS: nCircle
Risk ManagementService Platform and InfrastructureHardware / InfrastructureServers / ComputersCOTS: nCircle
Risk ManagementService Platform and InfrastructureHardware / InfrastructureLocal Area Network (LAN)COTS: nCircle
Risk ManagementService Platform and InfrastructureDatabase / StorageDatabaseCOTS: nCircle
Risk ManagementComponent FrameworkSecurityCertificates / Digital SignaturesCOTS: nCircle
Risk ManagementComponent FrameworkPresentation / InterfaceDynamic Server-Side DisplayCOTS: nCircle
Risk ManagementComponent FrameworkBusiness LogicPlatform DependentCOTS: nCircle
Risk ManagementComponent FrameworkData ManagementDatabase ConnectivityCOTS: nCircle
Risk ManagementComponent FrameworkData ManagementReporting and AnalysisCOTS: nCircle
Risk ManagementService Interface and IntegrationInteroperabilityData Format / ClassificationCOTS: nCircle
Education / TrainingService Access and DeliveryAccess ChannelsCollaboration / CommunicationsGOTS: Security Tips of the Day
Education / TrainingService Access and DeliveryAccess ChannelsOther Electronic ChannelsGOTS: Security Tips of the Day
Education / TrainingService Access and DeliveryAccess ChannelsOther Electronic ChannelsGOTS: Security Tips of the Day
Education / TrainingService Access and DeliveryDelivery ChannelsInternetGOTS: Security Tips of the Day
Education / TrainingService Access and DeliveryDelivery ChannelsIntranetGOTS: Security Tips of the Day
Education / TrainingService Access and DeliveryService RequirementsLegislative / ComplianceGOTS: Security Tips of the Day
Education / TrainingService Access and DeliveryService RequirementsHostingGOTS: Security Tips of the Day
Education / TrainingService Access and DeliveryService TransportService TransportGOTS: Security Tips of the Day
Education / TrainingService Access and DeliveryService TransportService TransportGOTS: Security Tips of the Day
Education / TrainingService Access and DeliveryService TransportService TransportGOTS: Security Tips of the Day
Education / TrainingService Access and DeliveryService TransportService TransportGOTS: Security Tips of the Day
Education / TrainingService Platform and InfrastructureSupport PlatformsPlatform DependentGOTS: Security Tips of the Day
Education / TrainingService Platform and InfrastructureDelivery ServersWeb ServersGOTS: Security Tips of the Day
Education / TrainingService Platform and InfrastructureDelivery ServersApplication ServersGOTS: Security Tips of the Day
Education / TrainingService Platform and InfrastructureDatabase / StorageDatabaseGOTS: Security Tips of the Day
Education / TrainingService Platform and InfrastructureHardware / InfrastructureServers / ComputersGOTS: Security Tips of the Day
Education / TrainingService Platform and InfrastructureHardware / InfrastructureEmbedded Technology DevicesGOTS: Security Tips of the Day
Education / TrainingService Platform and InfrastructureHardware / InfrastructureEmbedded Technology DevicesGOTS: Security Tips of the Day
Education / TrainingService Platform and InfrastructureHardware / InfrastructureEmbedded Technology DevicesGOTS: Security Tips of the Day
Education / TrainingService Platform and InfrastructureHardware / InfrastructureEmbedded Technology DevicesGOTS: Security Tips of the Day
Education / TrainingComponent FrameworkSecurityCertificates / Digital SignaturesGOTS: Security Tips of the Day
Education / TrainingComponent FrameworkSecuritySupporting Security ServicesGOTS: Security Tips of the Day
Education / TrainingComponent FrameworkPresentation / InterfaceStatic DisplayGOTS: Security Tips of the Day
Education / TrainingComponent FrameworkPresentation / InterfaceDynamic Server-Side DisplayGOTS: Security Tips of the Day
Education / TrainingComponent FrameworkData ManagementDatabase ConnectivityGOTS: Security Tips of the Day
Education / TrainingService Interface and IntegrationIntegrationMiddlewareGOTS: Security Tips of the Day
Education / TrainingService Interface and IntegrationIntegrationMiddlewareGOTS: Security Tips of the Day
 
  
I. F. 5. Will the application leverage existing components and/or applications across the Government (i.e., FirstGov, Pay.Gov, etc)?  
yes 
  
 
I. F. 5. a. If "yes", please describe.  
(long text - 2500 characters) 
As a service provider, USAID will promote the use of existing applications/components. 
  
I. F. 6. Does this investment provide the public with access to a government automated information system?  
no 
  
 
I. F. 6. a. If "yes", does customer access require specific software (e.g., a specific web browser version)?  
  
 
I. F. 6. a. 1. If "yes", provide the specific product name(s) and version number(s) of the required software and the date when the public will be able to access this investment by any software (i.e. to ensure equitable and timely access of government information and services).  
(medium text - 500 characters) 
  
PART IV: FOR "E-GOV AND LINES OF BUSINESS OVERSIGHT" ONLY  
Part IV should be completed only for investments which in FY08 are considered an E-Gov initiative or a Line of Business (LOB), i.e., selected the "E-Gov and LOB Oversight" choice in response to Question 6 in Part I, Section A above. Investments currently identified as "E-Gov and LOB Oversight" will complete only Part I and IV of the exhibit 300.
  
 
Section A: E-Gov and Lines of Business Oversight (All Capital Assets)  
Multi-agency initiatives, such as E-Gov and LOB initiatives, should develop a joint exhibit 300.
  
 
IV. A. 1. Stakeholder Table  
As a joint exhibit 300, please identify the agency stakeholders. Provide the partner agency and partner agency approval date for this joint exhibit 300. 
Partner AgencyJoint exhibit approval date
0248/16/2006
 
  
IV. A. 2. Partner Capital Assets within this Investment  
Provide the partnering strategies you are implementing with the participating agencies and organizations. Identify all partner agency capital assets supporting the common solution; Managing Partner capital assets should also be included in this joint exhibit 300. These capital assets should be included in the Summary of Spending table of Part I, Section B. (Character Limitations: Partner Agency Asset Title - 250 Characters) 
Partner AgencyPartner Agency Asset TitlePartner Agency Exhibit 52 UPI (BY2008)
024TBD 024-65-02-00-01-2100-24
 
  
IV. A. 3. Partner Funding Strategies ($millions)  
For jointly funded initiative activities, provide in the "Partner Funding Strategies Table": the name(s) of partner agencies; the UPI of the partner agency investments; and the partner agency contributions for CY and BY. Please indicate partner contribution amounts (in-kind contributions should also be included in this amount) and fee-for-service amounts. (Partner Agency Asset UPIs should also appear on the Partner Agency's exhibit 53. For non-IT fee-for-service amounts the Partner exhibit 53 UPI can be left blank.) 
Partner AgencyPartner Exhibit 53 UPI (BY2008)CY ContributionCY Fee-for-ServiceBY ContributionBY Fee-for-Service
024024-65-02-00-01-2100-24$0.00$0.00$0.00$0.00
 
  

Métier | work forward
Powered by WorkLenz
© Copyright. Métier, Ltd. 1999-2007. All rights reserved.
Patent Pending Application Numbers: 09/334,256;09/536,378;09/536,383;7,062,449;60/642,983;11/090,038
Version 5.0